THE TIMELINE

From the first drawing to handover

Progress on Avelor, updated as each stage completes. Nothing here is a rendering of a promise — it is where the building actually is.

  1. Complete

    Site acquired

    1.4 hectares above the bay, with building rights confirmed for eight floors.

  2. Complete

    Design approved

    Final architectural drawings signed off and the municipal permit issued.

    Design approved
  3. Complete

    Excavation

    Foundations dug and the retaining wall along the north slope poured.

    Excavation
  4. In progress

    Structure rising

    Floors one to five cast. The sea-facing terraces are now readable on site.

    Structure rising
  5. Upcoming

    Façade & glazing

    Stone cladding, window systems and the roof terrace structure.

    Façade & glazing
  6. Upcoming

    Handover

    Fit-out complete, amenities open, and the first keys handed to owners.